From first study to first kilowatt-hour.

kWh develops, finances, engineers, constructs and operates energy assets for businesses and utilities in the Horn of Africa.

Filmed at Horseed, Dayniile: 100.8 kWp of solar, operating

Move the load, not the land

City sites have sun but little room for solar panels. A battery needs a fraction of that ground. When the utility sells its midday solar power cheaply, a customer can buy all its power in the solar hours, store what it needs for the night and draw nothing from the grid after dark.

  • The customer pays less, without land for panels.
  • The utility sells more in the hours its solar makes power cheapest, and the evening peak falls.
  • kWh develops and finances the storage, sets up the tariff and the meters, and runs the system.

See the numbers for Horseed

Battery containerSolar on site
Own solar for 24-hour pumping
~482 kWp
about 4,800 m² of land, and a battery for the night
Time-of-use instead
battery in one container of about 15 m²
Difference
~320× less ground. Double the load and the solar field doubles; the battery still fits a container.
Indicative, drawn to scale. Horseed's 90 kW of pumps for 24 hours is 2,160 kWh a day. Own solar sized on Horseed's expected yield (4.5 kWh per kWp a day) at about 1 hectare per MWp; a 20-foot battery container covers about 15 m² and holds up to about 3.5 MWh.

Three things we do, from the plant to the bill

Power generation and storage

Diesel and grid power are expensive and unreliable for most sites in the region. We size generation and storage to the load you actually have, then build and run the plant.

More on power generation and storage

050100150200250kW00:0006:0012:0018:0000:00

Move across the chart, or focus it and use the arrow keys, to read each half hour.

  • Solar used directly
  • From the battery
  • Grid or diesel
  • Load
  • Solar available
Load met by solar
68%
Grid or diesel
764 kWh
Saved by the battery
212 kWh
Illustrative: one clear day, 220 kW of solar, zero export, battery of 420 kWh and 110 kW empty at midnight. Not project data.

Utility operations and AMI

A utility can only manage what it measures. Advanced metering connects every customer meter to the systems that bill, balance and protect the network.

More on utility operations and AMI

Measures energy at every customer, every 15 to 30 minutes, and switches supply for prepaid customers.

Meter selection: accuracy class, prepayment, tamper detection and the standards it must meet.

Schematic of an advanced metering infrastructure, from the meter to the bill. Select a link in the chain.

Time-of-use tariffs

When solar covers the midday hours, the expensive hours move to the evening. A time-of-use tariff gives customers a reason to use power when it costs least to make.

More on time-of-use tariffs

A day of grid use at Horseed

Solar hours0100200300400kW00:0006:0012:0018:0000:00USD 0.20no grid use
  • From the grid
  • From the battery
  • Pumps (90 kW)

Grid bill per month

FlatTime-of-use
Saving with time-of-use
40% less, USD 112,896 a year
Battery needed
1,440 kWh
Grid draw in solar hours
290 kW
Indicative what-if, not a quote or project data. Horseed's three 30 kW pumps, 30 days a month, solar hours 08:00 to 16:00, battery round-trip efficiency 90%. Grid energy only: the cost of the battery is not included.

Horseed: water pumped on sunlight

Three borehole pumps for Horseed Water Development now run on a 100.8 kWp solar plant that kWh developed, financed and built, with the grid as backup and nothing exported.

Read the Horseed case

kWh × Horseed, 1 min 11 s Plays without sound when you reach it; use the controls for sound.

100.8 kWp

160 modules × 630 Wp

3 × 30 kWborehole pumps running on solar, with the grid as backup

~165 MWhexpected solar generation a year

That is about 452 kWh a day on average, or 1,637 kWh per kWp a year.

From development to operation, step by step

Eight steps in four phases. Select a step to see what kWh delivers in it.

  1. Origination

    Find out whether an energy asset fits the need, and roughly how big it should be.

    What kWh delivers

    • Site visit and a first look at consumption, fuel bills or grid supply
    • A first size and an honest answer on whether it is worth studying further
  2. Feasibility

    Test the technical options and the economics before any money is committed.

    What kWh delivers

    • Demand and yield model, hour by hour, with solar, storage and backup together
    • Capex, operating cost and the fuel or grid energy each option saves
    • A clear recommendation with the assumptions written down
  3. Development

    Secure what the project needs to be built: site rights, permits, grid connection and a buyer for the power.

    What kWh delivers

    • Site and permit file, and the grid connection request
    • Offtake or energy-supply terms that match the business case
    • Shortlist of suppliers and contractors, with technical evaluation
  4. Financing

    Match the project to the right money: equity, debt, lease or energy-supply contract.

    What kWh delivers

    • Financial model and a structure that fits the offtaker
    • The technical and financial package lenders and investors ask for
    • Support to financial close
  5. Engineering

    Turn the feasibility design into drawings, specifications and orders.

    What kWh delivers

    • Detailed electrical and civil design, single-line diagram and protection
    • Procurement specifications and review of supplier offers
  6. Construction

    Build to the design, safely, on time and within budget.

    What kWh delivers

    • Site management and construction supervision
    • Quality checks against the design and a safe site
  7. Commissioning

    Prove the plant does what it was designed to do before it carries the load.

    What kWh delivers

    • Test and acceptance plan, and the tests themselves
    • As-built file and handover to operations
  8. Operation

    Keep the asset producing what it was designed to produce, for its whole life.

    What kWh delivers

    • Remote monitoring and maintenance planning
    • Performance reports: measured against expected yield, fuel displaced and CO₂ avoided
    • Advice when the load grows or the asset needs to expand

kWh is the international practice of kilowatuur.nl

In Weert, the Netherlands, kWh advises businesses on grid congestion, energy hubs and battery storage. What we learn on congested Dutch grids, we use here.

kilowatuur.nl (opens in a new tab)